What was done For 3 years now, Termal has been providing service and repair maintenance for the Adidas and Reebok chain of stores throughout Ukraine. For the Adidas and Reebok stores located in Lviv, Ivano-Frankivsk, Uzhhorod, Kramatorsk and Kyiv, the company’s specialists performed design work and used the most modern equipment for ventilation systems, heating […]
What was done From 2004 to the present day, Termal has implemented more than a hundred projects for the installation of ventilation, heating and air conditioning systems in private apartments and condos. Almost all of the facilities were unique and of different technical levels. At the beginning of the project, design work was necessarily carried […]
What was done For the Max Mara, Daniel, Hugo Boss chain of stores throughout Ukraine, Termal has been providing repair and maintenance services for 3 years. The company’s engineers completed design work and modernization:
What was done For a private house with an area of about 600 m2 Termal-Service performed the following set of works: The modern house has realized heating system on 2 different heat pumps that perfectly complement each other. The first one is a 16 kW Hitachi Hisanse multifunctional heat pump with a hydronic unit (works […]
What was done A set of works on the arrangement of HVAC systems for a network of gas stations was completed KLO in Kyiv and Kyiv region, namely: Boryspil, Brovary, Pereyaslav, Vyshneve, Klavdievo-Tarasove, Zabuchchia, Glevakha, Chabany and others. The stages of design and installation work at different facilities depended on the needs of the facility […]
What was done In a private 1-storey house with an area of 180 m2 in the White Stone cottage town, a Panasonic T-CAP 12 kW heat pump and a boiler room with a DHW boiler, a buffer tank, and a 3-way valve are installed. This heat pump works as the main source of heat and […]
In the operating office and warehouse complex, work was carried out on modernization of the ventilation system and installation of Hitachi VRF air-to-air heat pumps with indoor ducted units. Thanks to the installation of individually controlled heat pumps in each room, bills for heating, by about 4 times. A powerful AGT diesel generator was also […]
What was done For a private house in Koncha Zaspa, a failed geothermal heat pump system was replaced with Panasonic PAW-500WP5G air-to-water heat pumps with ECOi EX U-20ME2E8 ME2 outdoor VRF units – 2 sets with a capacity of about 112 kW. In addition, ducted fan coil units were replaced with more modern Daikin fan […]
What was done For the Tbilisuri restaurant, we developed ventilation design with heat recovery, installation of air conditioners/air heat pumps. Mounted supply and exhaust ventilation with a plate heat recuperator that returns up to 75% of heat energy in winter. All exhaust air from the facility is removed through stainless kitchen umbrellas with grease traps. […]
What was done The task of heating, ventilation and air conditioning of a detached house on the Odesa highway in the village of Gatne was completed with only 45 kW of electricity. The main air conditioning and ventilation system is a Hitachi VRF (air source heat pump). Outdoor units work with indoor units of cassette […]
What was done In the new office and branches Alfa-Bank In Kyiv, in 2019-2020, Termal implemented several projects to equip heating systems, ventilation and air conditioning. The HVAC system consists of: Special Daikin air conditioners are installed for the server rooms, which can withstand low temperatures. The company’s specialists fulfilled it:
What was done Termal Service Company has performed design work and equipment supply, assembly, commissioning of the autonomous heating, ventilation and air conditioning in the apartments on the top floor of the A52 residential complex. Panasonic Aquarea T-CAP KIT-WXC16H9E8 “Bi-bloc” heat pump was chosen as the main and only source of heat. The heat pump […]