- Client: Baumit
- Category: Factories and Plants
- Location: Brovary
What was done
For a plant for the production of dry building mixtures “BAUMIT” was completed by the specialists of the Termal Company:
- design solution
- supply of basic climate control equipment
- installation work
- commissioning and adjustment works ventilation systems, air heating and assimilation of excess moisture in production facilities.
High-efficiency ventilation units with a rotary recuperator and an intelligent automation system were used, which reduced electricity consumption by up to 72%.
Stages of work
Design
Design of ventilation and heating systems.
Supply of basic equipment
Equipment with the most economical fans, which saves up to 50% of electricity, and rotary recuperators, which save up to 72% of heat (natural gas), were used.
Installation work
The installation of air handling units, fan heaters, heating systems and automation was carried out very quickly, in coordination with the general contractor at the new production facility.
Start-up and adjustment
The commissioning of the systems at the new facility took only a few days, provided that the installation was carried out with high quality.