  • Client: Henkel
  • Category: Factories and Plants
  • Location: Vyshhorod

What was done

For the plant “Henkel” was conducted by the company’s specialists:

  • installation of new ventilation units with recuperators and air curtains (saving up to 60% of energy resources);
  • a set of solutions that reduce natural gas consumption by up to 60-70%;
  • design and installation of high-efficiency ventilation systems with heat recovery of up to 93% for new laboratories.

Stages of work

1

Energy audit

We conducted an energy audit and found ways to reduce natural gas consumption quickly and at minimal cost.

2

Development of an energy saving project

To dry the sand, the company has designed a high-temperature heat exchanger-utilizer that can return up to 80% of the heat back to the process cycle. Thus, in 3-5 months, large savings on natural gas will pay for the implementation of such a project.

3

Installation of new supply and exhaust systems

New air handling units with heat exchangers and industrial air curtains were installed for the laboratory, which saved up to 93% of energy and significantly improved work comfort.